Bolt-connected on site
No site welding required. Local crew with hand tools completes erection in 14–21 days for a 5,000 m² workshop.
Single-span, clear height 9 m, span up to 60 m. CE-compliant. Ships in 8 × 40 HQ containers.
Tell us the building footprint, location, and any drawings — we will revert with a full BOQ, weight take-off, and FOB price.
Send inquiryThe PEB-60 is our most-shipped pre-engineered workshop system. Designed in Tekla to AISC and Eurocode 3, each frame is shop-welded, surface-treated, and bolt-connected on site by your local crew using our supervisor. Wall and roof cladding ship in matching containers. One bill of lading, one HS code package, one accountable partner.
| Parameter | Value |
|---|---|
| Span | 12 m – 60 m |
| Clear height | 4 m – 12 m |
| Bay spacing | 6 m – 9 m |
| Wind load | Up to 0.85 kN/m² (designed per Eurocode 1) |
| Snow load | Up to 1.20 kN/m² |
| Seismic | Zone 1–4 (Eurocode 8 / GB 50011) |
| Main frame steel | Q355B / S355JR welded H-section |
| Surface | SP10 blast + 2-coat epoxy / optional hot-dip galv. |
| Cladding | EPS / PU / rock-wool sandwich panels, 50–150 mm |
| Lead time | 8 weeks ex-works |
| Packing | 40 HQ containers, 8 units typical for 5,000 m² |
| Certification | CE, ISO 9001, ISO 14001, EN 1090-1 EXC2 |
No site welding required. Local crew with hand tools completes erection in 14–21 days for a 5,000 m² workshop.
85 µm zinc coating on every member. Coastal, chemical, and freezer environments handled out of the box.
We deliver a stamped general arrangement, anchor-bolt layout, and erection manual signed by our chartered engineers.
Commercial invoice, packing list, CO, MTC, and CE Declaration of Performance — all bundled before shipment.